Home >> Mobile road barrier Technical product informations
Technical product informations

IBO WAND 500-18

BASt check in process
Attempt
Test TB 21 TB 41
Vehicle type car truck
Test date: 09.05.2018 11.12.2018
Containment level: T3 T3
Test location: Fakt GmbH, Benningen Fakt GmbH, Benningen
Test length: 144 m 144 m
Ground anchoring: Yes (only at the start) Yes (only at the start)
  TB 21 car 09.05.2018 T3 Fakt GmbH, Benningen 144 m Yes (only at the start)
  TB 41 truck 11.12.2018 T3 Fakt GmbH, Benningen 144 m Yes (only at the start)
System specification
TB 21 TB 41
Material Steel and concrete Steel and concrete
Height 0,52 m 0,52 m
Length of element 6 m 6 m
System width 0,12 m 0,12 m
Projected width: 0,18 m 0,18 m
Weight per m 150 kg 150 kg
  TB 21 Steel and concrete 0,52 m 6 m 0,12 m 0,18 m 150 kg
  TB 41 Steel and concrete 0,52 m 6 m 0,12 m 0,18 m 150 kg
Test result
TB 21 TB 41
Deflection: 0,3m 0,6m
Area of influence W1 W1
ASI-Value 0,3 (A) --
  TB 21 0,3m W1 0,3 (A)
  TB 41 0,6m W1 --
Mobile road barrier IBO Wand 500
Mobile road barrier IBO Wand 500

IBO WAND 500

BASt check 2013 7E 61
Attempt
Test TB 21 TB 41
Vehicle type car truck
Test date: 07.02.2013 08.02.2013
Containment level: T3 T3
Test location: TÜV Süd München TÜV Süd München
Test length: 150 m 150 m
Ground anchoring: nein nein
  TB 21 car 07.02.2013 T3 TÜV Süd München 150 m nein
  TB 41 truck 08.02.2013 T3 TÜV Süd München 150 m nein
System specification
TB 21 TB 41
Material Steel and concrete Steel and concrete
Height 0,52 m 0,52 m
Length of element 6 m 6 m
System width 0,12 m 0,12 m
Projected width: 0,24 m 0,24 m
Weight per m 150 kg 150 kg
  TB 21 Steel and concrete 0,52 m 6 m 0,12 m 0,24 m 150 kg
  TB 41 Steel and concrete 0,52 m 6 m 0,12 m 0,24 m 150 kg
Test result
TB 21 TB 41
Deflection: 0,3m 0,7m
Area of influence W1 W2
ASI-Value 0,3 (A) --
  TB 21 0,3m W1 0,3 (A)
  TB 41 0,7m W2 --
Mobile road barrier IBO Wand 500
Mobile road barrier IBO Wand 500

IBO WAND 850-30

BASt check in process
Attempt
Test TB 11 TB 42 TB 21 TB 41
Vehicle type car truck car truck
Test date: 20.03.2018 20.03.2018 09.11.2018 09.11.2018
Containment level: H1 H1 T3 T3
Test location: Fakt GmbH, Benningen Fakt GmbH, Benningen Fakt GmbH, Benningen Fakt GmbH, Benningen
Test length: 96 m 96 m 96 m 96 m
Ground anchoring: Yes (only at the start) Yes (only at the start) Yes (only at the start) Yes (only at the start)
  TB 11 car 20.03.2018 H1 Fakt GmbH, Benningen 96 m Yes (only at the start)
  TB 42 truck 20.03.2018 H1 Fakt GmbH, Benningen 96 m Yes (only at the start)
  TB 21 car 09.11.2018 T3 Fakt GmbH, Benningen 96 m Yes (only at the start)
  TB 41 truck 09.11.2018 T3 Fakt GmbH, Benningen 96 m Yes (only at the start)
System specification
TB 11 TB 42 TB 21 TB 41
Material Steel and concrete Steel and concrete Steel and concrete Steel and concrete
Height 0,85 m 0,85 m 0,85 m 0,85 m
Length of element 6 m 6 m 6 m 6 m
System width 0,30 m 0,30 m 0,30 m 0,30 m
Projected width: 0,16 m 0,16 m 0,16 m 0,16 m
Weight per m 333 kg 333 kg 333 kg 333 kg
  TB 11 Steel and concrete 0,85 m 6 m 0,30 m 0,16 m 333 kg
  TB 42 Steel and concrete 0,85 m 6 m 0,30 m 0,16 m 333 kg
  TB 21 Steel and concrete 0,85 m 6 m 0,30 m 0,16 m 333 kg
  TB 41 Steel and concrete 0,85 m 6 m 0,30 m 0,16 m 333 kg
Test result
TB 11 TB 42 TB 21 TB 41
Deflection: 0,4m 1,2m 0,3m 0,5m
Area of influence W2 W4 W1 W1
ASI-Value 1,3 (A) ---   0,3 (A) ---  
  TB 11 0,4m W2 1,3 (A)
  TB 42 1,2m W4 --
  TB 21 0,3m W1 0,3 (A)
  TB 41 0,5m W1 --
Mobile road barrier IBO Wand 850-30
Mobile road barrier IBO Wand 850-30

IBO WAND 850

BASt check 2014 7E 57
Attempt
Test TB 11 TB 42
Vehicle type car truck
Test date: 12.12.2013 12.12.2013
Containment level: H1 H1
Test location: TÜV Süd München TÜV Süd München
Test length: 96 96
Ground anchoring: Yes (only at the start) Yes (only at the start)
  TB 11 car 12.12.2013 H1 TÜV Süd München 96 m Yes (only at the start)
  TB 42 truck 20.03.2018 H1 TÜV Süd München 96 m Yes (only at the start)
System specification
TB 11 TB 42
Material Steel and concrete Steel and concrete
Height 0,85 m 0,85 m
Length of element 6 m 6 m
System width 0,50 m 0,50 m
Projected width: 0,16 m 0,16 m
Weight per m 333 kg 333 kg
  TB 11 Steel and concrete 0,85 m 6 m 0,50 m 0,16 m 333 kg
  TB 42 Steel and concrete 0,85 m 6 m 0,50 m 0,16 m 333 kg
Test result
TB 11 TB 42
Deflection: 0,8m 1,3m
Area of influence W2 W4
ASI-Value 1,4 (B) --
  TB 11 0,8m W2 1,4 (B)
  TB 42 1,3m W4 --
Mobile road barrier IBO Wand 850